Akordi Duration Forecaster Tool

Analyze XER files to group similar tasks and calculate duration overruns

Upload XER files for duration forecaster
💡 Note: If the project does not have a baseline, upload the XER file in Upload As-Built and leave the Upload Baseline field blank.
Baseline XER file
As-Built or latest XER available
Excel file with tasks to exclude (optional)
⚙️ Settings
We recommend to start with 7
Enter keywords to exclude (e.g., DELETE, TEST, etc.)